Black Dog Long Lead 5m

Black Dog Long Lead 5m

$37.50

The Black Dog Long Lead is a long 5 metre dog leash to be used for training for your dog.

Teach your dog to stay near you when walking. Great for general training, recall training and tracking.

Or allowing dogs to roam in the park, camping or the beach, while still maintaining lead control.

Read full description

Description

Black Dog Long Lead 5m

The Black Dog Long Lead is a long 5 metre dog leash to be used for training for your dog.

Teach your dog to stay near you when walking. Great for general training, recall training and tracking.

Or allowing dogs to roam in the park, camping or the beach, while still maintaining lead control.

Dimensions: 20mm wide (approx), 5 Metres Long with snaphook and handle.

Colours available: Red, Green, Purple, Black, Pink, Orange, Blue

Additional information

Weight N/A
Brand

Black Dog

Colour

, , , , , ,

Go to Top